12. Explain (IN DETAIL), when and why prototyping might be preferred over the traditional SDLC approach.
Initial SDLC Costs are Higher than Initial Prototyping
Costs, although later costs tend to be higher. If a system is to be small scale, intended to be short
term, or if replacement is anticipated in the (relatively) near future,
Prototyping may be preferred.